As a follow up to the previous post, Steve Rindsberg of PPTools has some how-to info for those that are willing to delve into VBA coding.
Sub VertTheDominantParaLegal()
With ActivePresentation.Slides(1).Timeline
With .MainSequence.Item(1)
.Timing.Duration = 108000
End with
End with
End Sub
Note 1: Steve’s info was specific to PPT 2007, so not certain how it works in PPT 2003 or 2010.
Note 2: I do zero VBA coding, so I am no help with how to use this code or trouble shooting it (I leave that to the code pro’s like Steve).
– Troy @ TLC